Production changeover

FlowManufacturing CloudManufacturing

A line supervisor at Meadowline Foods plans the changeover of carton filling Line 4 from oat drink 1 L to almond drink 330 mL: the plan sections, the downtime and output figures, the changeover window on the line timeline, planned versus actual output of the last changeover beside the downtime breakdown, the preparation checklist, the cleaning level and the QA approver.

39 / 262
Loading preview